World

Greece-Bulgaria gas pipeline starts commercial operation

Oct 02, 2022

Sofia (Bulgaria), October 2: The Greece-Bulgaria gas pipeline, the Gas Interconnector Greece-Bulgaria (IGB), started commercial operation on Saturday, according to ICGB AD, owner and operator of the IGB.
The IGB connects with the Greek national gas transmission system and the Trans-Adriatic gas pipeline (TAP AG) in the area of Komotini of Greece, and with the Bulgarian gas transmission system in the area of Stara Zagora of Bulgaria, according to a press release by the operator.
The total length of the gas pipeline is 182 km, and the designed capacity is up to 3 billion cubic meters per year.
Bulgaria used to rely on Russian imports for more than 80 percent of its gas needs, according to local media reports.
Source: Xinhua

More news

Nysh.in Introduces BluHeat Pain Relief Patches: Your Solution to Back Pain Woes!

Mumbai (Maharashtra) [India], April 19: Nysh.in, a trusted and leading provider of effective pain relief innovations, proudly announces the launch of its latest product - BluHeat Pain Relief Patches for back pain. Designed to address the needs of working professionals and home makers alike, who often endure back pain due to long hours of sitting or standing with poor posture, BluHeat Pain Relief Patches offer a natural, chemical-free solution that is trusted and certified for its efficacy.

Apr 19, 2024